Project Brief
A constrained development site required an engineered drainage solution where gravity discharge and available site storage were limited.
Our Scope
RCC Engineers reviewed contributing catchments, storage requirements, pump-well capacity, above-ground storage, pipe and pit storage and the nominated discharge arrangement.
Engineering Outcome
An integrated pumped drainage and storage solution was developed to achieve the required stormwater capacity within the available site constraints.