Where the significance or progression of movement cannot be determined from a single inspection, RCC Engineers can establish an appropriate monitoring and re-inspection strategy.
Repeat crack measurements, floor-level observations, wall-alignment measurements or other relevant indicators can be compared over time to determine whether measurable change is occurring and whether further investigation or rectification is warranted.