<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>RCC Engineers &#8211; RCC Engineers</title>
	<atom:link href="https://rcceng.com.au/author/adams/feed/" rel="self" type="application/rss+xml" />
	<link>https://rcceng.com.au</link>
	<description></description>
	<lastBuildDate>Tue, 13 Oct 2026 17:39:57 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://rcceng.com.au/wp-content/uploads/2026/09/fav-150x150.png</url>
	<title>RCC Engineers &#8211; RCC Engineers</title>
	<link>https://rcceng.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Cracks in Your House: When Should You Call a Structural Engineer?</title>
		<link>https://rcceng.com.au/cracks-in-your-house-when-should-you-call-a-structural-engineer/</link>
					<comments>https://rcceng.com.au/cracks-in-your-house-when-should-you-call-a-structural-engineer/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 17:34:50 +0000</pubDate>
				<category><![CDATA[Forensic & Inspections]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/cracks-in-your-house-when-should-you-call-a-structural-engineer/</guid>

					<description><![CDATA[Cracks are common in buildings, but their significance depends on more than width alone. The location, pattern, direction, progression and relationship with floor movement, drainage and site conditions all matter.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">A structural or forensic engineer should be considered where cracking is increasing, recurring, widespread or accompanied by uneven floors, sticking doors, wall separation or other movement indicators.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/cracks-in-your-house-when-should-you-call-a-structural-engineer/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Building Movement in Melbourne Homes: Drainage, Trees and Reactive Soils</title>
		<link>https://rcceng.com.au/building-movement-in-melbourne-homes-drainage-trees-and-reactive-soils/</link>
					<comments>https://rcceng.com.au/building-movement-in-melbourne-homes-drainage-trees-and-reactive-soils/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 16:34:50 +0000</pubDate>
				<category><![CDATA[Forensic & Inspections]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/building-movement-in-melbourne-homes-drainage-trees-and-reactive-soils/</guid>

					<description><![CDATA[Many Victorian homes are founded on reactive soils that can expand and shrink as ground moisture changes.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Poor surface drainage, leaking services, changes to landscaping and nearby vegetation can all influence moisture conditions around foundations. Building movement therefore needs to be assessed as a combination of the structure, foundations and surrounding site conditions rather than by looking at the cracks alone.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/building-movement-in-melbourne-homes-drainage-trees-and-reactive-soils/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Structural Engineer vs Building Inspector: What Is the Difference?</title>
		<link>https://rcceng.com.au/structural-engineer-vs-building-inspector-what-is-the-difference/</link>
					<comments>https://rcceng.com.au/structural-engineer-vs-building-inspector-what-is-the-difference/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 15:34:50 +0000</pubDate>
				<category><![CDATA[Forensic & Inspections]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/structural-engineer-vs-building-inspector-what-is-the-difference/</guid>

					<description><![CDATA[A building inspection and a structural engineering assessment serve different purposes.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">A building inspector typically reports on visible building defects and general condition, while a structural engineer can assess structural behaviour, load paths, movement, foundation performance and the engineering significance of identified defects.</p>



<p class="wp-block-paragraph">Where cracking, movement, structural modification or possible failure is involved, engineering assessment may be required in addition to a general building inspection.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/structural-engineer-vs-building-inspector-what-is-the-difference/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Removing a Load-Bearing Wall: What Engineering Is Required?</title>
		<link>https://rcceng.com.au/removing-a-load-bearing-wall-what-engineering-is-required/</link>
					<comments>https://rcceng.com.au/removing-a-load-bearing-wall-what-engineering-is-required/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 14:34:50 +0000</pubDate>
				<category><![CDATA[Structural Design]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/removing-a-load-bearing-wall-what-engineering-is-required/</guid>

					<description><![CDATA[Removing a load-bearing wall changes the way loads are transferred through a building.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Before work begins, the existing structure should be assessed so that the supported roof, floor or upper-level loads can be safely transferred through a new beam, posts, connections and foundations where required.</p>



<p class="wp-block-paragraph">RCC Engineers can assess the proposed opening and prepare the structural calculations and documentation required for the alteration.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/removing-a-load-bearing-wall-what-engineering-is-required/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>What Is an LPOD and Why Does Council Require It?</title>
		<link>https://rcceng.com.au/what-is-an-lpod-and-why-does-council-require-it/</link>
					<comments>https://rcceng.com.au/what-is-an-lpod-and-why-does-council-require-it/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 13:34:50 +0000</pubDate>
				<category><![CDATA[Civil & Construction]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/what-is-an-lpod-and-why-does-council-require-it/</guid>

					<description><![CDATA[A Legal Point of Discharge (LPOD) is the approved location where stormwater from a property is permitted to discharge.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Depending on the site, the LPOD may connect to a kerb, council pit, underground drain or another approved drainage point. Its location and level can directly influence the site drainage design, detention requirements and whether gravity drainage is achievable.</p>



<p class="wp-block-paragraph">RCC Engineers can incorporate the nominated LPOD into the overall stormwater strategy and engineering documentation.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/what-is-an-lpod-and-why-does-council-require-it/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>OSD vs Retention: Understanding Stormwater Requirements</title>
		<link>https://rcceng.com.au/osd-vs-retention-understanding-stormwater-requirements/</link>
					<comments>https://rcceng.com.au/osd-vs-retention-understanding-stormwater-requirements/#respond</comments>
		
		<dc:creator><![CDATA[RCC Engineers]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 12:34:50 +0000</pubDate>
				<category><![CDATA[Civil & Construction]]></category>
		<guid isPermaLink="false">https://rcceng.com.au/osd-vs-retention-understanding-stormwater-requirements/</guid>

					<description><![CDATA[On-site detention and retention are related but serve different purposes.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">OSD temporarily stores stormwater and releases it at a controlled rate to reduce peak discharge. Retention stores water for reuse, infiltration or other purposes and may reduce the total volume discharged from the site.</p>



<p class="wp-block-paragraph">Some developments require one system, while others require a combination of both depending on council, planning and site requirements.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://rcceng.com.au/osd-vs-retention-understanding-stormwater-requirements/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
